Target date
The date that governs your work
Where you are today
Current stage

Use zero if your target only requires a Phase I self-assessment or internal readiness. Enter an assessor lead time only when a contract, prime, or planned assessment calls for it.

Computing from today's date

Pending

This planner reads today's date in your browser and works back from it. The verdict and the schedule below fill in as soon as the page has loaded.

Days until target datePending
Your work-back schedule
  1. 01Confirm contract and prime requirementsNow
  2. 02Scoping and gap assessment completePending
  3. 03Remediation completePending
  4. 04SSP and evidence package completePending
  5. 05Readiness review and mock assessment completePending
  6. 06Evidence package and defensible score baseline completePending

Model assumptions: preparation durations reflect typical mid-size DIB contractor timelines (scoping and gap assessment 6 weeks, remediation 14 weeks, SSP and evidence 6 weeks, readiness review 3 weeks); certification processing and SPRS posting take about 4 weeks after assessment when a C3PAO path is selected. Preparation runs in parallel with any entered assessor lead time. Actual timelines vary with scope, environment complexity, and assessor availability. These are planning estimates, not scheduling commitments. Nothing entered here leaves your browser.

Will Your Timeline Close Before the Date That Actually Applies?

The Department suspended the former November 10, 2026 Phase II transition on July 13, 2026. Use the date that still governs your work: a solicitation, prime flow-down, recompete, planned assessment, or internal assurance milestone. Your preparation time includes gap assessment, remediation, SSP and evidence, and readiness review. Add a C3PAO lead time only when your actual target calls for one.

This calculator runs both clocks against your target date and tells you which one is your constraint, when each milestone must land, and how many days of slack - or deficit - your current plan carries.


Methodology

The schedule model reflects typical mid-size Defense Industrial Base contractor timelines:

  • Scoping + gap assessment: 6 weeks
  • Remediation: 14 weeks (7 weeks if already underway)
  • SSP + evidence package: 6 weeks
  • Readiness review / mock assessment: 3 weeks
  • Certification processing + SPRS posting: ~4 weeks after assessment

Preparation runs in parallel with any assessor lead time you enter. Use zero for a Phase I self-assessment or internal readiness target, and use a current quote from your selected C3PAO when planning a third-party assessment.

Why a mock assessment is in the base model: contractors who compressed preparation under 6 months show roughly a 35% assessment failure rate versus 8% on normal timelines. A failed assessment costs the fee, the slot, and months of re-queue time - the readiness review is the cheapest insurance in the schedule.


Reading Your Result

  • On track (30+ days of slack): protect the schedule. Slack evaporates fast when remediation uncovers scope you didn't know about.
  • Tight (0-30 days): your plan has no room for a failed control family or a slipped slot. Compress the preparation phases and consider a readiness partner.
  • Behind: you will not make day-one eligibility on the current plan. The queue penalizes every month of delay, so the move is to book a C3PAO slot now anyway and compress everything you control - not to wait for the picture to improve.

For the full scheduling picture, read The C3PAO Backlog Math. To locate your gaps before you plan, take the free readiness assessment. And to compress the remediation-and-evidence phase from months to weeks, see the 30-day CMMC pilot.

REC 0002RELATED RECORDSsha3-25648d7ef06c7ef6e5078d486f3d72284f256de6abc0e62196278899e441e75101cprev:c38fd965337e

Related records

Guides and articles describe the work. The evidence that work produces is described in three proof pages and one architecture page.

proof.state
Proof of State. What the environment was, as of a date someone else picks: point-in-time records, content hashed and chained.
proof.change
Proof of Change. Who or what altered the environment, under what authority, with before and after state hashes.
proof.agency
Proof of Agency. What a machine was permitted to do before it acted, what it did, and what would have stopped it.
architecture
Architecture. How the chain is built and where it lives: inside your tenant, with no egress of evidence.

Related records in the content registers

Plan the dates here. Keep the evidence in your tenant.

Sealed
Last amended
Unchanged since sealing
Author
PolicyCortex Team
Register colophonRecomputable by a second party
SeqLabelSHA3-256Prev
REC 0000HEAD1791c3819edfadd80aeff4c8
REC 0001INSTRUMENTc38fd965337e1791c3819edf
REC 0002RELATED RECORDS48d7ef06c7efc38fd965337e

The record headers on this page are SHA3-256 digests of this page's own copy, chained in sequence from a fixed genesis value. Edit one word of any record's copy above and every digest after it changes. Head of chain: sha3:48d7ef06c7ef. The product does the same thing to your evidence.