Register:Tools3 recordsSHA3-256 chainedhead sha3:534c6852d27e4eaf2c8f006d8fc3e216ae1dcbceaa41412b4f133a32e6d659d7Intact
REC 0001INSTRUMENTsha3-2568f4981012e8f2e69d91ac81c3b5126ac83cb1586cb23cdb51324465a0cd4381eprev:cd79d2ea4b91
Organization profile
Organization size
Assessment complexity

Simple means one cloud and minimal in-scope systems. Complex means multi-cloud, 200 or more resources, and multiple physical locations.

Fully loaded cost per hour for cleared security professionals. The $150/hr default is conservative.

Compliance approach

Ticket-based remediation and periodic, hand-assembled evidence.

Estimated three-year total

$810K

With continuous evidence collection$340K, 58% less
Annual run rate (three-year average)$270K
Evidence collection labor, three years$163K

Estimates are based on DIB assessment benchmark data. C3PAO fees vary by assessor, scope, and complexity. Labor costs assume a fully loaded rate of $150/hr. Actual costs will differ. Nothing entered here leaves your browser.

How Much Will CMMC Level 2 Cost You?

CMMC Level 2 certification involves more than a C3PAO assessment fee. This calculator estimates your total compliance program cost across four categories: assessment fees, pre-assessment remediation, evidence collection labor, and ongoing annual maintenance.

Adjust the inputs to match your organization's profile.


Methodology

Cost estimates are based on:

  • Published C3PAO pricing ranges and DoD assessment data
  • Industry benchmark data on remediation timelines and labor costs
  • Evidence collection labor benchmarks from defense contractor compliance programs
  • Ongoing compliance maintenance cost patterns across the DIB

Labor rate assumption: $150/hour (conservative for cleared security professionals). Adjust for your actual fully-loaded rate.


Cost Categories Explained

C3PAO Assessment Fee

Third-party assessment by a CMMC-authorized C3PAO. Fees vary based on organization size, system complexity, and assessment scope. Typical ranges:

  • Small contractor (< 100 employees, simple scope): $75,000 – $125,000
  • Mid-size contractor (100-500 employees): $125,000 – $200,000
  • Large prime/complex multi-cloud: $200,000 – $400,000+

Pre-Assessment Gap Remediation

Technical remediation of findings discovered before your C3PAO engagement. Organizations that conduct rigorous pre-assessment gap analysis and remediate before scheduling their C3PAO significantly reduce assessment costs and avoid failed assessments.

Evidence Collection Labor

Manual evidence collection for a CMMC Level 2 assessment typically requires:

  • Initial collection: 200–400 hours
  • Quarterly review cycles: 40–80 hours each
  • Pre-assessment sprint: 100–150 hours

At $150/hour, this represents $30,000–$90,000 per certification cycle before any remediation work.

With automated evidence collection: 80–95% reduction in collection labor. Evidence is generated continuously and requires review rather than collection.

Annual Compliance Maintenance

Ongoing costs to maintain certification posture between assessments:

  • Continuous monitoring tool licensing
  • Periodic control testing
  • Staff time for compliance maintenance
  • Training and awareness programs

Key Insight: The Automation ROI

The largest variable in CMMC compliance cost is remediation velocity and evidence collection efficiency.

ApproachMean Remediation TimeEvidence CollectionAnnual Maintenance
Manual workflows18 days per finding300+ hrs/cycleHigh
Automated (PolicyCortex)< 4 minutes< 30 hrs/cycleLow

Organizations with automated continuous monitoring reduce assessment preparation time by 68% and post-assessment compliance drift by 81% - translating directly to lower ongoing compliance costs.


REC 0002RELATED RECORDSsha3-256534c6852d27e4eaf2c8f006d8fc3e216ae1dcbceaa41412b4f133a32e6d659d7prev:8f4981012e8f

Related records

Guides and articles describe the work. The evidence that work produces is described in three proof pages and one architecture page.

proof.state
Proof of State. What the environment was, as of a date someone else picks: point-in-time records, content hashed and chained.
proof.change
Proof of Change. Who or what altered the environment, under what authority, with before and after state hashes.
proof.agency
Proof of Agency. What a machine was permitted to do before it acted, what it did, and what would have stopped it.
architecture
Architecture. How the chain is built and where it lives: inside your tenant, with no egress of evidence.

Related records in the content registers

Estimate here. Verify in your tenant.

Sealed
Last amended
Unchanged since sealing
Author
PolicyCortex Team
Register colophonRecomputable by a second party
SeqLabelSHA3-256Prev
REC 0000HEADcd79d2ea4b91da052ec26b0b
REC 0001INSTRUMENT8f4981012e8fcd79d2ea4b91
REC 0002RELATED RECORDS534c6852d27e8f4981012e8f

The record headers on this page are SHA3-256 digests of this page's own copy, chained in sequence from a fixed genesis value. Edit one word of any record's copy above and every digest after it changes. Head of chain: sha3:534c6852d27e. The product does the same thing to your evidence.