What 3.4.4 means in practice

Before a change goes in, someone with security knowledge works out what it could break or expose and records the answer. The analysis can be brief for small changes, but it has to happen before implementation, not after.

SPRS points and the CMMC POA&M

CMMC Level 2 practice
CM.L2-3.4.4
SPRS points
1 point. When it is not met, the DoD Assessment Methodology subtracts 1 from the score of 110.
CMMC POA&M
Allowed. It is worth 1 point, and 32 CFR 170.21(a)(2)(ii) admits requirements worth 1 point. Conditional status also needs a score of at least 88, and the item must be closed within 180 days.

Sources: NIST SP 800-171 DoD Assessment Methodology, version 1.2.1 (June 24, 2020), Annex A; 32 CFR 170.21, Plan of Action and Milestones requirements.

What an assessor checks for 3.4.4

NIST SP 800-171A gives one determination statement for 3.4.4.

Determine if the security impact of changes to the system is analyzed prior to implementation.

NIST SP 800-171A (June 2018), assessment objectives for 3.4.4

Evidence that shows 3.4.4 is met

  • The procedure for security impact analysis.
  • Change records with a completed security impact section dated before implementation.
  • Results from a test environment for significant changes.

How PolicyCortex gathers the evidence

No PolicyCortex collector reads the evidence for 3.4.4. Your team provides the evidence listed above.

Meet the requirement once. Keep the evidence current.

Published
Last updated
Unchanged since publication