What 3.4.3 means in practice

Every change to the system is tracked, reviewed, approved or rejected, and logged. A ticketing or change management system usually holds this record, from the request through the approval to the change as made.

SPRS points and the CMMC POA&M

CMMC Level 2 practice
CM.L2-3.4.3
SPRS points
1 point. When it is not met, the DoD Assessment Methodology subtracts 1 from the score of 110.
CMMC POA&M
Allowed. It is worth 1 point, and 32 CFR 170.21(a)(2)(ii) admits requirements worth 1 point. Conditional status also needs a score of at least 88, and the item must be closed within 180 days.

Sources: NIST SP 800-171 DoD Assessment Methodology, version 1.2.1 (June 24, 2020), Annex A; 32 CFR 170.21, Plan of Action and Milestones requirements.

What an assessor checks for 3.4.3

NIST SP 800-171A gives 4 determination statements for 3.4.3, each found satisfied or other than satisfied. Determine if:

  1. 3.4.3[a] changes to the system are tracked.
  2. 3.4.3[b] changes to the system are reviewed.
  3. 3.4.3[c] changes to the system are approved or disapproved.
  4. 3.4.3[d] changes to the system are logged.

NIST SP 800-171A (June 2018), assessment objectives for 3.4.3

Evidence that shows 3.4.3 is met

  • The change management procedure.
  • Change tickets showing request, review, approval or rejection, and implementation.
  • Logs that tie implemented changes back to approved tickets.

How PolicyCortex gathers the evidence

No PolicyCortex collector reads the evidence for 3.4.3. Your team provides the evidence listed above.