What 3.7.1 means in practice

Systems are maintained on purpose and on schedule: patches, firmware updates, hardware repairs and replacements. Keep a maintenance schedule and a record of what was done, by whom and when, for hardware and software alike.

SPRS points and the CMMC POA&M

CMMC Level 2 practice
MA.L2-3.7.1
SPRS points
3 points. When it is not met, the DoD Assessment Methodology subtracts 3 from the score of 110.
CMMC POA&M
Not allowed. It is worth 3 points, and 32 CFR 170.21(a)(2)(ii) admits only requirements worth 1 point, with one exception: 3.13.11 when encryption is used but not FIPS validated.

Sources: NIST SP 800-171 DoD Assessment Methodology, version 1.2.1 (June 24, 2020), Annex A; 32 CFR 170.21, Plan of Action and Milestones requirements.

What an assessor checks for 3.7.1

NIST SP 800-171A gives one determination statement for 3.7.1.

Determine if system maintenance is performed.

NIST SP 800-171A (June 2018), assessment objectives for 3.7.1

Evidence that shows 3.7.1 is met

  • The maintenance schedule or patch cycle.
  • Maintenance records or tickets with dates and the people who did the work.
  • Update management configuration for servers and endpoints.

How PolicyCortex gathers the evidence

PolicyCortex reads this evidence with the collectors below, read only, and grades 3.7.1 from it. Each line says what the product checks.

  • Azure Update Manager: Maintenance configurations. Reads Azure Update Manager maintenance configurations and checks that system maintenance is scheduled.

Meet the requirement once. Keep the evidence current.

Published
Last updated
Unchanged since publication