What 3.3.3 means in practice

The list of events you log is not fixed. Set a schedule, for example yearly or after an incident or a major change, to review which event types are captured, and add or drop types based on what the review finds.

SPRS points and the CMMC POA&M

CMMC Level 2 practice
AU.L2-3.3.3
SPRS points
1 point. When it is not met, the DoD Assessment Methodology subtracts 1 from the score of 110.
CMMC POA&M
Allowed. It is worth 1 point, and 32 CFR 170.21(a)(2)(ii) admits requirements worth 1 point. Conditional status also needs a score of at least 88, and the item must be closed within 180 days.

Sources: NIST SP 800-171 DoD Assessment Methodology, version 1.2.1 (June 24, 2020), Annex A; 32 CFR 170.21, Plan of Action and Milestones requirements.

What an assessor checks for 3.3.3

NIST SP 800-171A gives 3 determination statements for 3.3.3, each found satisfied or other than satisfied. Determine if:

  1. 3.3.3[a] a process for determining when to review logged events is defined.
  2. 3.3.3[b] event types being logged are reviewed in accordance with the defined review process.
  3. 3.3.3[c] event types being logged are updated based on the review.

NIST SP 800-171A (June 2018), assessment objectives for 3.3.3

Evidence that shows 3.3.3 is met

  • The documented review process and how often it runs.
  • Records of past reviews and the decisions they reached.
  • Change records showing the logging configuration updated after a review.

How PolicyCortex gathers the evidence

No PolicyCortex collector reads the evidence for 3.3.3. Your team provides the evidence listed above.

Meet the requirement once. Keep the evidence current.

Published
Last updated
Unchanged since publication